• Removed Pile Head Concrete Protecting Steel Bars From Damage
  • Removed Pile Head Concrete Protecting Steel Bars From Damage
  • Removed Pile Head Concrete Protecting Steel Bars From Damage
  • Removed Pile Head Concrete Protecting Steel Bars From Damage
  • Removed Pile Head Concrete Protecting Steel Bars From Damage
  • Removed Pile Head Concrete Protecting Steel Bars From Damage

Removed Pile Head Concrete Protecting Steel Bars From Damage

After-sales Service: Installation Guidance
Warranty: Consumables
Application: Pile Head Cutter
Condition: New
Quality Guarantee Period: 6month
Storage Environment: Dry Environment
Samples:
US$ 6.2/Piece 1 Piece(Min.Order)
| Request Sample
Gold Member Since 2023

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
ES Type
Product Specifications
35mmw*600mml
Weight
0.7kg
Transport Package
Carton & Vacuum Packing
Specification
720*150*200mm
Trademark
WYC
Origin
China
Production Capacity
5000000pieces/Year

Product Description

Removed Pile Head Concrete Protecting Steel Bars From DamageRemoved Pile Head Concrete Protecting Steel Bars From Damage
Removed Pile Head Concrete Protecting Steel Bars From DamageRemoved Pile Head Concrete Protecting Steel Bars From Damage
PILE HEAD CUTTER("PHC")
NAME APPLICATION PACKING
PHC(ES) Small cut pile head Ф500mm-Ф800mm 600×35mm×10pcs
PHC(S) Large cut pile head Ф900mm-Ф1200mm 700×45mm×10pcs
PHC(B) Large cut pile head Ф1300mm or more 550×70mm×10pcs
Bracket
NAME ACCESSORY
For PHC(ES) Bracket type ESB The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head
For PHC(S) Bracket type B
For PHC(B) Bracket type BB/DBB
De-bonding foam
NAME REMARKS
De-bonding foam
for vertical reinforcement anchor bar
There are five sizes with a diameter of 16-40mm
 
Removed Pile Head Concrete Protecting Steel Bars From Damage
How the PHC Works
 
1.  The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2.  The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3.  The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components

   1.  PHC
                a) Type ES-35mmWx600mml
                b) Type S-45mmlWx700mml
                c) Type B-70mmWx550mml
   2.  Steel Reinforcement De-Bonding Covers
        Various sizes - From Φ16mm to Φ40mm
   3.  Steel Brackets
                a) Type ESB
                b) Type SB
                c) Type BB
                d) Type DBB
     4.   Plastic bag 
                a) 5C-W130mm-L1100mm
                b) 5C-W140mm-L1400mm

 
Installation Procedure
   
   1.  The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
   2.  
The PHC are initially fitted to the steel brackets.
     3.  The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
   4.  Install de-bonding covers to all the steel 
Reinforcement starter bars above the PHC.
   5.  
The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
 
Pile Head Removal

   1.   After concreting, wait 4 to 5 days for crack to form at the pile head.
   2.  
When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
 
                                            CONFIGURATION OF PHC FOR EACH PILE SIZE
Removed Pile Head Concrete Protecting Steel Bars From Damage

Removed Pile Head Concrete Protecting Steel Bars From DamageRemoved Pile Head Concrete Protecting Steel Bars From DamageRemoved Pile Head Concrete Protecting Steel Bars From DamageRemoved Pile Head Concrete Protecting Steel Bars From DamageQ: Why choose our product?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.

Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.

Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.

Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.

Q: How long is the shelf life of the product?
A: 
In a dry environment  6-8 month.

Q: Which country have you exported?
A:  
Most Southeast Asian countries.




























 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Trading Company
Number of Employees
4
Year of Establishment
2010-09-07