• Anti Moisture Packaging Plastic Bags
  • Anti Moisture Packaging Plastic Bags
  • Anti Moisture Packaging Plastic Bags
  • Anti Moisture Packaging Plastic Bags
  • Anti Moisture Packaging Plastic Bags
  • Anti Moisture Packaging Plastic Bags

Anti Moisture Packaging Plastic Bags

Industrial Use: Apparel
Transparency: Translucent
Layered: Basic Level
Hardness: Rigid
Packaging: Bag
Bag Sealing Methods: Flat Bag Packaging
Gold Member Since 2023

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
plastic bag 5C-130mm-1100mm
Transport Package
Pack of 100
Specification
plastic bag 5C-130mm-1100mm
Trademark
WYC
Origin
Fuzhou
Production Capacity
5000000pieces/Year

Product Description

Anti Moisture Packaging Plastic Bags
Anti Moisture Packaging Plastic Bags
Anti Moisture Packaging Plastic Bags
 
Anti Moisture Packaging Plastic Bags
Anti Moisture Packaging Plastic Bags
Anti Moisture Packaging Plastic Bags
Our product is designed to be used in conjunction with PHC and is not intended for standalone use. It is designed to wrap around PHC to prevent moisture from seeping in, allowing for better product performance
PILE HEAD CUTTER("PHC")
NAME APPLICATION PACKING
PHC(ES) Small cut pile head Ф500mm-Ф800mm 600×35mm×10pcs
PHC(S) Large cut pile head Ф900mm-Ф1200mm 700×45mm×10pcs
PHC(B) Large cut pile head Ф1300mm or more 550×70mm×10pcs
Bracket
NAME ACCESSORY
For PHC(ES) Bracket type ESB The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head
For PHC(S) Bracket type B
For PHC(B) Bracket type BB/DBB
De-bonding foam
NAME REMARKS
De-bonding foam
for vertical reinforcement anchor bar
There are five sizes with a diameter of 16-40m
Anti Moisture Packaging Plastic Bags
How the PHC Works
 
1.  The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2.  The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3.  The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components
 
   1.  PHC
                a) Type ES-35mmWx600mml
                b) Type S-45mmlWx700mml
                c) Type B-70mmWx550mml
   2.  Steel Reinforcement De-Bonding Covers
        Various sizes - From Φ16mm to Φ40mm
   3.  Steel Brackets
                a) Type ESB
                b) Type SB
                c) Type BB
                d) Type DBB
     4.   Plastic bag 
                a) 5C-W130mm-L1100mm
                b) 5C-W140mm-1400mm

 
Installation Procedure
   
   1.  The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
   2.  
The PHC are initially fitted to the steel brackets.
     3.  The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
   4.  Install de-bonding covers to all the steel 
Reinforcement starter bars above the PHC.
   5.  
The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
 
Pile Head Removal

   1.   After concreting, wait 4 to 5 days for crack to form at the pile head.
   2.  
When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Trading Company
Number of Employees
4
Year of Establishment
2010-09-07